Project Details
- Home
- Project Details
50 MW Ground-Mounted Solar farm Reddiarpatti region of Tirunelveli
Land Details & Location Advantages
Prime Location: 260 acres of contiguous dry land located in Reddiarpatti, Tirunelveli, Tamil Nadu — a region known for its excellent solar potential.
High Solar Irradiance: The site receives 5.5–5.8 kWh/m²/day, which is above the national average, enabling a higher Capacity Utilization Factor (CUF) and strong power generation efficiency.
Favorable Topography: The land is flat and unshaded, significantly minimizing civil work, site preparation, and levelling costs — ideal conditions for large-scale solar installation.



Why This Land Works for Solar
When it comes to solar energy, location matters — and Reddiarpatti, in Tamil Nadu’s Tirunelveli district, offers everything a high-performing solar project needs.
Spacious & Ready: We have 260 acres of dry, contiguous land — fully owned and ready for development. No fragmentation, no hassles — just open land with clear skies.
Sun-Soaked Efficiency: With solar irradiance between 5.5 and 5.8 kWh/m²/day, this region outperforms the national average. That means more sunlight, better output, and a stronger return on investment.
Naturally Ideal Terrain: The land is flat, unshaded, and construction-friendly, which keeps groundwork simple and costs low. No major levelling. No unexpected surprises.
We chose this site with purpose — because great solar starts with the right foundation.
Solar Irradiance & Site Suitability
The Reddiarpatti region of Tirunelveli is among India’s top-performing solar zones — offering both exceptional solar potential and logistical advantages.
- Strong Solar Irradiance:
The region receives Global Horizontal Irradiance (GHI) of 5.5–5.8 kWh/m²/day, making it highly suitable for solar energy production. - High CUF Potential:
With fixed-tilt installations, the Capacity Utilization Factor (CUF) ranges from 18% to 20%, with potential for higher efficiency through solar tracking systems. - Optimal Climate Conditions:
The site enjoys low annual rainfall, stable terrain, and abundant sunlight — reducing installation challenges and improving long-term performance.- Grid Feasibility:
The region already hosts solar parks and lies with DISCOMs, ensuring ease of grid integration and transmission reliability.
- Grid Feasibility:
Project details:
Project Capacity
:
50 MW Ground-Mounted Solar PV
Location
:
Reddiarpatti, Tirunelveli, Tamil Nadu
Cost per MW
:
₹6.5 Crore
Total Project Cost
:
₹325.00 Crore
Promoter Equity (Land Value)
:
₹81.25 Crore (25%)
Debt Requirement
:
₹243.75 Crore (75%)